Apparently the computer centre will be used by a local film production company for digital post production. This is an innovative bit of ICT industry development by the The City of Bunbury and State Government of Western Australia.
After weeks of careful preparation, cement for the raised Library floor was poured on 12 March 2008. Starting at 3am, the continuous pour was successfully completed by midday the same day. A significant undertaking, the floor is over 1,600sqm in size, weighs 1,320 tonnes, and required 550 cubic metres of concrete.
Once the concrete cures, work will resume to install tilt panel walls and structural steelwork to create the Library’s interior spaces.
Project construction information
Contractor Cimeco Pty Ltd
Architect Peter Hunt Architect
Structural and civil BPA Engineering
Mechanical Consultant Geoff Hesford Engineering
Electrical Consultant Best Consultants
Hydraulic Consultant Hutchinson Associates
Quantity Surveyor Davis Langdon Australia
From: Our new City/Regional Library Diary, Entry No. 6, City of Bunbury, March 2008
No comments:
Post a Comment